Design, consulting, and fabrication

Master Bathroom Remodel

Time to remodel the master bath. For such a small space there sure was a ton of concrete. There was probably 3 inches on the floor and 2 inches of it on the walls, then tile on top of that. It took two bagsters for this little 5’x8′ room.

2017-01-08 14.20.00

Once we had it down to studs I framed out the new walk in shower for a new shower wall product from Kohler. I had to brace it for 24 hours so the adhesives could cure.

IMG_4385

I ordered the fixed glass on line, used our original sink and toilet, and had a lovely Irish fellow do some great tile work. All Done.

Bathroom leftBathroom center showerBthroom right

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s