Design, consulting, and fabrication

Posts tagged “salvage

A New Closet Too

Since we had to create a ton of dust for the bathroom we figured, why not just do the closet too. Originally it had a small single door into the closet, a 24″ wide door, and then the space was about 5′ wide so you had to kind of crawl in there to get anything tucked away in the back. So we decided to open it up and put some drawers in as well. Room for two wardrobes.Closet closed

The drawer faces and shelf trim are made out of the oak pallet that the shower walls came in.

Closet open


Master Bathroom Remodel

Time to remodel the master bath. For such a small space there sure was a ton of concrete. There was probably 3 inches on the floor and 2 inches of it on the walls, then tile on top of that. It took two bagsters for this little 5’x8′ room.

2017-01-08 14.20.00

Once we had it down to studs I framed out the new walk in shower for a new shower wall product from Kohler. I had to brace it for 24 hours so the adhesives could cure.

IMG_4385

I ordered the fixed glass on line, used our original sink and toilet, and had a lovely Irish fellow do some great tile work. All Done.

Bathroom leftBathroom center showerBthroom right

 


Coffee table for Monroe Harding fundraiser

This table is made with leftover wood from the fireplace surround I did last fall. I also picked up some short pieces of 3×8 and 2×4 for the legs and spreader from Good Wood Nashville. coffee table 3

Coffee table 2